Top Set Training · iOS
Switch programs. Keep your data.
Most training apps are built around a single program. When you outgrow Stronglifts and want to try 5/3/1, you start over in a different app: new UI to learn, training maxes and rep history left behind. Top Set Training runs 19 proven programs under one roof, with your progress carrying through when you switch.
Programs aren't a destination. They're a phase.
Most lifters cycle through four to six programs over their training career. You start with Stronglifts or Starting Strength because linear progression is the right tool when you're new. You plateau and graduate to 5/3/1 or nSuns. You want a hypertrophy block and run PHUL. Your back gets cranky so you do twelve weeks of back-friendly hypertrophy. You peak for a meet on 5/3/1 FSL. Then you reset and start an accumulation block on GZCLP.
Other apps assume you'll commit to one program forever. Top Set Training is built around the reality that you won't.
Your data moves with you
This is the part that doesn't exist in other lifting apps. When you switch from one program to another inside Top Set Training:
- Your training maxes carry over. No re-entering, no spreadsheet shuttle.
- Your full workout history stays put. Every set you've logged is still there, searchable across every program you've ever run.
- Your E1RM chart keeps building. Estimated one-rep max graphed across all your lifting, not reset every time you switch programs.
- Your plate inventory, unit preference, and saved templates remain. You set them up once.
- The UI is the same. Switching programs is picking a new option from a list. You're not learning a new app.
How each program progresses
Top Set Training implements each program's actual progression rules, not a generic one-size-fits-all model. Two main flavors:
Linear progression
Used by Stronglifts, Starting Strength, Greyskull, and the beginner half of GZCLP. Complete all your sets at the prescribed weight, the next session adds a fixed jump (typically 5 lb on upper-body lifts, 10 lb on lower). Miss your reps a configurable number of times in a row, the app deloads you automatically. The same logic you'd run on paper, without the paper.
AMRAP-based auto-regulation
Used by the SBS 20-week, nSuns, 5/3/1, and most intermediate programs. Each week, your last set is a rep-out target. After you log it, the app maps the difference between the target and what you actually hit to a percentage change for next week's training max.
- 2+ below target−5%
- 1 below−2%
- Hit target0%
- 1 over+0.5%
- 3 over+1.5%
- 5+ over+3.0%
Each program tunes these rates (nSuns is more aggressive on lower-body, 5/3/1 has its own four-week cycle of TM resets, and so on). You don't have to think about any of it.
Setting your starting numbers first? Use the free training max calculator and one-rep max calculator to dial them in before your first session.
Inside the app
The history screenshot below is the one to look at — those three cycles are three different programs (StrongLifts 5×5, Starting Strength, GZCLP), all in the same lifter's continuous history.
The programs
Three are free. Everything else is unlocked by premium.
Free
Premium
What premium adds
Premium is one purchase or one subscription, your choice. Everything below is unlocked together.
- All 19 programs. Everything beyond the three free ones.
- Full workout history. Every set you've ever logged, across every cycle. Free users see the current cycle only — fine while you're locked into one program, painful once you start switching.
- E1RM progress chart. Estimated one-rep max graphed over time per lift, across every program you've run.
- Plate calculator. Visual barbell display with the right plates to load for each working set.
- Unlimited templates. Save as many custom workouts as you want. Free tier gets one.
- Supersets in rest periods. Pair accessories into the rest timer so you stop wasting it.
- Lock-screen Live Activity. Rest timer stays on your lock screen and in the Dynamic Island.
- Apple Fitness sync. Workouts automatically logged with duration and calories.
Get the app
Free to download with three complete programs. Premium unlocks the rest at $0.99/week, $2.99/month, or $14.99 for lifetime access.